top of page
pexels-moritz-boing-288041-846980.jpg
Asset 8.png

Douro 149 MWdc Portugal

Delivering bankability, earning loyalty

Discover how GameChange Energy helped overcome the challenges of developing a 149 MWdc solar project on some of Portugal’s most demanding terrain. This case study examines the Douro PV plant, where hard granite rock formations, steep slopes, and tight construction timelines required an innovative approach to project execution.

Learn how the MaxSpan™ fixed-tilt system, combined with advanced geotechnical expertise, foundation optimization, grading analysis, and coordinated logistics, helped reduce construction complexity, control costs, and maintain schedule certainty.

Download the case study

Success text input

Error text

Duoro 149 MW Case Study

Download the full case study to see how a strategic engineering and execution approach not only delivered a successful project but also laid the foundation for a long-term partnership spanning nearly 400 MWdc of solar installations across Portugal.

Download

bottom of page