top of page
pexels-moritz-boing-288041-846980.jpg
Asset 8.png

Escobales 144 MWdc Colombia

Adapting design to complex terrain and regulatory changes

See how GameChange Energy helped deliver the 144 MWdc Escobales Solar Project in Colombia despite challenging terrain, evolving environmental requirements, and complex regulatory conditions. This case study explores how GCE partnered with the project owner, EPC, and local stakeholders to develop a flexible solar racking solution that combined Genius Tracker™ and MaxSpan™ systems, enabling the project to adapt to changing site constraints while maintaining progress toward commercial operation.

Learn how in-house geotechnical expertise, responsive engineering, and proactive field support helped minimize schedule risk, overcome construction challenges, and keep one of Colombia’s largest solar projects on track. Complete the form to download the full case study and discover how GCE solves real-world challenges on utility-scale solar developments.

Download the case study

Success text input

Error text

Escobales 144 MWdc Case Study

Download the full case study to see how collaborative engineering, flexible solar racking solutions, and responsive project execution helped keep one of Colombia’s largest solar projects on track.

Download

bottom of page