The 283 MWp Mooi Plaats Solar PV Project near Noupoort, South Africa, presented a complex engineering challenge. As new site information became available and the project design evolved, the tracker system needed to adapt to changing layouts, variable terrain and demanding wind conditions.
GameChange Energy worked closely with the project team throughout the engineering process, carrying out multiple terrain evaluations and adapting the structural design as requirements changed. The flexibility of the Genius Tracker™ 3.0 platform helped accommodate these changes while maintaining structural integrity and keeping the project on track.
The project achieved timely grid connectivity and demonstrated an exceptional 99.9% average operational uptime across all deployed phases.
Read the full case study for a closer look at the engineering behind Mooi Plaats.

Download the case study
Success text input
Error text